特级大胆西西4444人体,欧美大交乱XXXXBBBB,JIZZJIZZ少妇亚洲水多,久久久久久久久免费无码,无码婬AV片在线观看涩涩涩导航

Press & report

Is Your Photovoltaic Power Station Ready For Summer?

The turn of spring and summer is a period of frequent strong convective weather, and the subsequent hot summer is accompanied by high temperature, heavy rain and thunder and other weather, and the photovoltaic power station on the roof has undergone multiple tests. So, how do we usually take countermeasures to ensure the stable operation of photovoltaic power plants and ensure profits?


For summer heat

1. Pay attention to cleaning and cleaning the shelters on the power station, so that the components are always in a state of ventilation and heat dissipation.

2. Please clean the power station in the early morning or evening, avoid exposure to the sun and high temperature at noon and afternoon, because the sudden cooling will cause the temperature difference of the glass plate of the module, and there may be cracks on the surface of the panel. Therefore, it is necessary to choose early morning and evening when the temperature is lower.

photovoltaic

3. High temperature may cause the aging of the internal components of the inverter, so it is very important to ensure that the inverter has good ventilation and heat dissipation conditions. The inverters are basically installed outdoors. During installation, SKYWORTH puts the inverters in a cool place to avoid direct sunlight, such as the back of the module and under the eaves. A cover plate will be added for outdoor installations to fully ensure the ventilation of the inverters. and heat dissipation.


Rainstorm for summer

A lot of rainwater will soak the cables and components, which will reduce the insulation performance. If it is damaged, it will directly lead to the inability to generate electricity.

If your house has a sloping roof, it will have a strong drainage capacity, please don't worry;

3

If it is a flat roof, frequent inspections of the power station are required. Note: During inspection operation and maintenance in rainy days, avoid electrical operations with bare hands, do not directly touch the inverter, components, cables, and terminals, etc., you need to wear rubber gloves and rubber boots to reduce the risk of electric shock.


Lightning for summer

The lightning protection facilities of photovoltaic power plants should also be checked regularly. In the current lightning protection measures, the most effective and extensive method is to connect the metal parts of electrical equipment to the ground. The grounding system consists of four parts: grounding equipment, grounding body, lead-in wire and earth.

4

Avoid repairing electrical equipment and circuits with bare hands, wear insulating rubber gloves, beware of the risk of electric shock, and take measures to prevent high temperature, rainstorm, typhoon, and lightning strikes. It should be noted that Skyworth Photovoltaic and PICC have purchased exclusive comprehensive insurance for each power station to escort the power station, and users do not need to bear the risk for damage caused by natural disasters.


FACEBOOK

  • Pre sales consultation
  • After sales consultation

customer service

Linkedin

  • Pre sales consultation
  • After sales consultation

customer service

CONTACT US

  • Pre sales consultation
  • After sales consultation

customer service

Whatsapp

return

Sweep the official account

国产果冻videoXXXX黑人 | 精品人妻一区二区三区线国色天香 | 国产一二三区在线 | 国产AV影音先锋 | 91精品国产乱码久久久久久 | 亚洲AV成人精品毛片 | 国产精品乱码一区二区免费视频 | 成人免费观看完整在线观看 | 国产做视频在线观看 | 欧美日韩乱一区二区三区 | 北野人妻无码精品一区 | 髙清无码A片一区二区三区 成人免费观看完整在线观看 | 国产精品一二三有三州 | 成人A片产无码免费视频奶头软件 | 影音先锋中文字幕在线一区二区 | 无码中文字幕一区二区免费蜜桃 | 国语对白清晰刺激对白 | 亚洲一区欧美在线观看 | 99riAV视频一区二区 | 高清无码免费视频 | 欧美AAA校花破处视频 | 亚洲精品久久久久久 | 久久激情国产一区 | 少妇搡BBBB搡BBB搡毛片 | 色婷婷AV在线播放 | 又硬又黄的视频在线观看 | 日本黄色视频陈人 | 免费av网站在线观看 | ,粉嫩小泬BBBB免费看 | 欧美色图亚洲色图日本韩 | 4399成人黄A片 | 国产亚洲AV无码成人片 | 最好看的中文在线观看 | 在线观看黄色视频网站 | 亚洲AV成人无码久久精品贰佰网 | 亚洲av成人片无码久久久 | 亚洲免费骚黄网站 | 亚洲无码在线视频网站 | 蜜桃人妻Ⅴ一v二精品视频 大地资源宾利影视大全套餐 | 中文字幕人妻一区二区 | 日本A级片免费看 |